Dosto,

After all what has chagned in rural areas of UK during these 7 yrs? I have seen in many places of UK where peopel have to still walk a long distance to reach in the road. The hardship of people is the same as it was before becoming the UK a separate state.

There are several roads whose construction is suspended since song.

We will discuss here about this. Sure i will put some facts where Govt of UK has been failed to make the road under PMGSY etc.

M S Mehta

एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #1 on: October 19, 2007, 09:36:04 AM »

Now see this news.

मोटर मार्ग पूर्व सर्वे के आधार पर न बना तो आंदोलन करेगे ग्रामीण

 बागेश्वर। नव युवक संगठन समिति की मंडलसेरा में आयोजित बैठक में वक्ताओं ने जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग का निर्माण प्रारम्भिक सर्वे के आधार पर शीघ्र किए जाने की मांग की है साथ ही निर्णय लिया है कि अगर शीघ्र कार्य प्रारम्भ न किया तो ग्रामीण आंदोलन को बाध्य होंगे।
   समिति के अध्यक्ष किशन लाल विश्वकर्मा की अध्यक्षता में सम्पन्न बैठक में वक्ताओं ने कहा कि शासन के निर्देश पर लोक निर्माण विभाग द्वारा कई वर्ष पूर्व जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग की सर्वे कर शासन को प्रस्ताव भेज दिया परंतु अब लोनिवि के अधिकारी निजी स्वार्थो के लिए इस मोटर मार्ग को बदलने का प्रयास कर रहे हैं जो कि ग्रामीणों के साथ अन्याय है व इससे उनकी उपजाऊ भूमि को नुकसान होगा। ग्रामीणों ने शीघ्र मोटर मार्ग निर्माण प्रारम्भ किए जाने की मांग की। वक्ताओं ने कहा कि मंडलसेरा में कई स्थानों में बरसाती नालों से बरसात में उपजाऊ भूमि को खतरा बना रहता है इसके लिए प्रशासन को सुरक्षा उपाय करने चाहिए। तय कि अगर उनकी मांगें न मानी गई तो ग्रामीण आंदोलन करेगे।

[Friday, October 19, 2007 2:17:41 AM (IST) ]

एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #2 on: October 19, 2007, 09:49:05 AM »

Now have a look on this news... As again 842 villages who qualify to be connected with a road link under PMGSY, only 32 have got the connectivity. This news in detials (Uttarakhand news on red below)

Printer friendly page With Banner | Without Banner  Friday, September 14, 2007
 Ministry of Rural Development   
   
 
 MINISTRY OF RURAL DEVELOPMENT REVIEWS PMGSY PROJECTS

ASKS STATE GOVERNMENTS TO GET ADDITIONAL PROJECT IMPLEMENTATION UNITS
--------------------------------------------------------------------------------
 
 12:4 IST 
Providing rural connectivity is an important component of time-bound targeted ambitious BHARAT NIRMAN Programme of the Central Government. Under Rural Connectivity programme, all villages of 1000+ population (500+ in case of hilly and tribal areas) are to be provided with all-weather connectivity by the year 2009.

The Ministry of Rural Development, while reviewing the performance of Pradhan Mantri Gram Sadak Yojana (PMGSY) in the States of Assam, Chattisgarh, J&K, Jharkhand, Orissa, Tripura, UP, Uttaranchal and West Bengal has expressed concern over slow progress in implementatioin of this programme, despite availability of sufficient funds and proper and effective support by Government of India.

In the State of Assam, as against the eligible 5641 villages, so far only 1150 villages have been provided with connectivity and Ministry has cleared proposals to connect only 1598 habitations. During the year 2006-07, as against the target of providing connectivity to 1998 habitations, only 804 habitations have been provided with connectivity. As against the target of construction of new roads of 2864 K.m., only 1552 km. have been constructed.

In the State of Chattisgarh, as against the eligible 4728 villages, so far only 1129 villages have been provided with connectivity and Ministry has cleared proposals to connect only 1954 habitations. During the year 2006-07, as against the target of providing connectivity to 1310 habitations, only 632 habitations have been provided with connectivity. As against the target of construction of 4368 km., only 2645 km. have been constructed.

In the State of J&K, as against the eligible 1468 villages, so far only 19 villages have been provided with connectivity and Ministry has cleared proposals to connect only 373 habitations. During the year 2006-07, as against the target of providing connectivity to 352 habitations, only 16 habitations have been provided with connectivity. As against the target of construction of 1059 km., only 49 km. have been constructed.

In the State of Jharkhand, as against the eligible 3877 villages, so far only 209 villages have been provided with connectivity and Ministry has cleared proposals to connect only 490 habitations. During the year 2006-07, as against the target of providing connectivity to 1295 habitations, only 108 habitations have been provided with connectivity. As against the target of construction of 2594 km., only 308 km. have been constructed.

In the State of Orissa, as against the eligible 4447 villages, so far only 683 villages have been provided with connectivity and Ministry has cleared proposals to connect only 1683 habitations. During the year 2006-07, as against the target of providing connectivity to 874 habitations, only 322 habitations have been provided with connectivity. As against the target of construction of 1986 km., only 1602 km. have been constructed.

In the State of Tripura, as against the eligible 810 villages, so far only 65 villages have been provided with connectivity and Ministry has cleared proposals to connect only 534 habitations. During the year 2006-07, as against the target of providing connectivity to 183 habitations, only 53 habitations have been provided with connectivity. As against the target of construction of 262 km., only 176 km. have been constructed.

In the State of UP, as against the eligible 3825 villages, so far only 1923 villages have been provided with connectivity and Ministry has cleared proposals to connect only 3397K habitations. During the year 2006-07, as against the target of providing connectivity to 1533 habitations, only 979 habitations have been provided with connectivity. As against the target of construction of 2391 km., only 2383 km. have been constructed.

In the State of Uttarakhand, as against the eligible 842 villages, so far only 31 villages have been provided with connectivity and Ministry has cleared proposals to connect only 340 habitations. During the year 2006-07, as against the target of providing connectivity to 106 habitations, only 15 habitations have been provided with connectivity. As against the target of construction of 422 km., only 106 km. have been constructed.
In the State of West Bengal, as against the eligible 13070 villages, so far only 1930 villages have been provided with connectivity and Ministry has cleared proposals to connect only 4129 habitations. During the year 2006-07, as against the target of providing connectivity to 2738 habitations, only 960 habitations have been provided with connectivity. As against the target of construction of 2573 km., only 1508 km. have been constructed.

The States have been asked to get additional project implementation units dedicated to implement PMGSY and increase the absorption capacity to at least four times of the present capacity. Submission of DPRs of all remaining habitations will have to be made within the next six months. States have also been advised to increase contractual capacity and also to take steps for ensuring availability of construction materials. States have also been asked to ensure proper quality of construction by putting in place first and second tier quality monitoring effectively.

For detailed information, view this link...


http://pib.nic.in/release/release.asp?relid=31236

SMK/ST/JA 

एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #3 on: October 19, 2007, 02:48:47 PM »

Govt must look into seriously.

एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #4 on: October 19, 2007, 05:17:58 PM »

Thrugh the newspaper, we come know about such news from differnet parts of UK..



Now see this news.

मोटर मार्ग पूर्व सर्वे के आधार पर न बना तो आंदोलन करेगे ग्रामीण

 बागेश्वर। नव युवक संगठन समिति की मंडलसेरा में आयोजित बैठक में वक्ताओं ने जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग का निर्माण प्रारम्भिक सर्वे के आधार पर शीघ्र किए जाने की मांग की है साथ ही निर्णय लिया है कि अगर शीघ्र कार्य प्रारम्भ न किया तो ग्रामीण आंदोलन को बाध्य होंगे।
   समिति के अध्यक्ष किशन लाल विश्वकर्मा की अध्यक्षता में सम्पन्न बैठक में वक्ताओं ने कहा कि शासन के निर्देश पर लोक निर्माण विभाग द्वारा कई वर्ष पूर्व जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग की सर्वे कर शासन को प्रस्ताव भेज दिया परंतु अब लोनिवि के अधिकारी निजी स्वार्थो के लिए इस मोटर मार्ग को बदलने का प्रयास कर रहे हैं जो कि ग्रामीणों के साथ अन्याय है व इससे उनकी उपजाऊ भूमि को नुकसान होगा। ग्रामीणों ने शीघ्र मोटर मार्ग निर्माण प्रारम्भ किए जाने की मांग की। वक्ताओं ने कहा कि मंडलसेरा में कई स्थानों में बरसाती नालों से बरसात में उपजाऊ भूमि को खतरा बना रहता है इसके लिए प्रशासन को सुरक्षा उपाय करने चाहिए। तय कि अगर उनकी मांगें न मानी गई तो ग्रामीण आंदोलन करेगे।

[Friday, October 19, 2007 2:17:41 AM (IST) ]


एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #5 on: October 20, 2007, 09:49:21 AM »
मोटर मार्ग पूर्व सर्वे के आधार पर न बना तो आंदोलन करेगे ग्रामीणOct 19, 02:17 am

बागेश्वर। नव युवक संगठन समिति की मंडलसेरा में आयोजित बैठक में वक्ताओं ने जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग का निर्माण प्रारम्भिक सर्वे के आधार पर शीघ्र किए जाने की मांग की है साथ ही निर्णय लिया है कि अगर शीघ्र कार्य प्रारम्भ न किया तो ग्रामीण आंदोलन को बाध्य होंगे।

समिति के अध्यक्ष किशन लाल विश्वकर्मा की अध्यक्षता में सम्पन्न बैठक में वक्ताओं ने कहा कि शासन के निर्देश पर लोक निर्माण विभाग द्वारा कई वर्ष पूर्व जीतनगर- मंडलसेरा- बालीघाट मोटर मार्ग की सर्वे कर शासन को प्रस्ताव भेज दिया परंतु अब लोनिवि के अधिकारी निजी स्वार्थो के लिए इस मोटर मार्ग को बदलने का प्रयास कर रहे हैं जो कि ग्रामीणों के साथ अन्याय है व इससे उनकी उपजाऊ भूमि को नुकसान होगा। ग्रामीणों ने शीघ्र मोटर मार्ग निर्माण प्रारम्भ किए जाने की मांग की। वक्ताओं ने कहा कि मंडलसेरा में कई स्थानों में बरसाती नालों से बरसात में उपजाऊ भूमि को खतरा बना रहता है इसके लिए प्रशासन को सुरक्षा उपाय करने चाहिए। तय कि अगर उनकी मांगें न मानी गई तो ग्रामीण आंदोलन करेगे।


एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #6 on: October 23, 2007, 10:50:24 AM »

Dosto,

i have been persuing this case for the last 5 yrs. Finally, we have to resort Dharana to open the eyes of concnered authorities.

मोटर मार्ग निर्माण शीघ्र किया जायOct 23, 02:24 am

बागेश्वर। विकास खंड के बैड़ा-मझेड़ा के ग्रामीणों ने पांकड़- बैड़ा- मझेड़ा मोटर मार्ग का शीघ्र निर्माण न किए जाने पर आंदोलन की चेतावनी दी है।

ग्राम प्रधान समेत ग्रामीणों द्वारा जिलाधिकारी को दिए ज्ञापन में कहा कि यह मोटर मार्ग प्रधानमंत्री सड़क योजना के तहत स्वीकृत हुआ है साथ ही इसकी तीन बार सर्वे करा दी गई है। परंतु अब तक इसका निर्माण कार्य प्रारम्भ नहीं किया है जिस कारण ग्रामीणों को यातायात की सुविधा नहीं मिल पा रही है। ग्रामीणों ने चेतावनी दी है कि अगर शीघ्र निर्माण कार्य प्रारम्भ नहीं किया तो आंदोलन किया जाएगा।




एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #7 on: October 31, 2007, 09:25:47 AM »
मोटर मार्ग को महिलाओं और पुलिस में झड़पOct 30, 02:05 am

गुप्तकाशी (रुद्रप्रयाग)। शहीद गोविंद सिंह के नाम से बनाए जा रहे जाखधार-देवर मोटर मार्ग में भूमि विवाद को लेकर सोमवार को रुद्रपुर ग्रामसभा की महिलाओं एवं पुलिस के बीच तीन घटे तक जोरदार झड़प हुई। इसके बावजूद वन विभाग द्वारा 47 पेड़ों का छपान किया गया।

जाखधार-देवर मोटर मार्ग के सर्वे को लेकर रुद्रपुर गांव के लोगों का भारी विरोध है। सोमवार को उप जिलाधिकारी मोहन सिंह के नेतृत्व में लोक निर्माण विभाग, वन विभाग व पुलिस फोर्स मौके पर गई। यहां पहले से ही रुद्रपुर की पचास से अधिक महिलाएं मौजूद थीं। पुलिस प्रशासन जैसे ही मार्ग निर्माण संबंधी कार्रवाई करने लगा, रुद्रपुर की महिला मंगल दल की अध्यक्ष अंजू व नव युवक मंगल दल के अध्यक्ष दीप नारायण शुक्ला के नेतृत्व में महिलाओं ने जोरदार विरोध शुरू कर दिया। महिलाएं पेड़ों पर चढ़कर विरोध करने लगी। इस पर मौजूद पुलिस फोर्स ने महिलाओं एवं अन्य को वहां से जबरन हटाया। इस दौरान महिलाओं एवं पुलिस के बीच लगभग तीन घंटे तक जोरदार झड़प होती रही, लेकिन पुलिस फोर्स की मदद से वन विभाग द्वारा 47 पेड़ों का छपान किया गया। उप जिलाधिकारी मोहन सिंह ने कहा कि विकास कार्यो में बाधा डालने वालों के खिलाफ सख्त कार्रवाई की जाएगी।

पंकज सिंह महर

  • Core Team
  • Hero Member
  • *******
  • Posts: 7,401
  • Karma: +83/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #8 on: November 01, 2007, 12:08:23 PM »
मेहता जी,
सड़क विकास के लिये जरूरी तो है, बननी भी चाहिये और उत्तराखण्ड बनने के बाद इस दिशा में काफी कार्य हुआ भी है. १० साल के भीतर पूरा उत्तराखण्ड सड़क से पूर्ण आच्छादित हो जायेगा. लेकिन एक पहलू यह भी है कि सड़क पहाडों की दुश्मन भी है, क्योंकि सडक बनाने के लिये पहाडों को तोड्ना पड़ता है और वह कमजोर होते है, आप्ने देखा होगा कि अधिकतर सड़्कें बरसात में बंद ही रहती हैं, लेकिन विकास के लिये पहाडों की बलि तो देनी ही होगी......
!

एम.एस. मेहता /M S Mehta 9910532720

  • Core Team
  • Hero Member
  • *******
  • Posts: 40,912
  • Karma: +76/-0
Re: WHEN PEPOLE UK VILLAGES WILL GET ROAD CONNECTIVITY ?
« Reply #9 on: November 04, 2007, 08:30:18 PM »
घपला : पचास करोड़ खर्च, नहीं बनी सड़केंNov 03, 03:14 am

उत्तरकाशी। केंद्र सरकार ने प्रधानमंत्री ग्राम सड़क योजना के तहत जिले को एक अरब से अधिक की धनराशि दी, लेकिन 60 करोड़ खर्च होने के बाद भी लोनिवि एक भी सड़क का निर्माण पूरा नहीं कर पाया है। सांसद व विधायक की नाराजगी के बाद विभाग के अधिकारी सड़कों में हुए गोलमाल पर पर्दा डालने की कोशिश में जुटे हैं।

सीमांत जिले में फेज पांच तक के लिए एक अरब 20 करोड़ नौ लाख 18 हजार रुपये की धनराशि स्वीकृत हुई। सड़क निर्माण की प्रगति पर नजर डालें तो आधी सड़क निर्मित होने के बाद विभाग के अफसर एक टिप्पणी लगाकर बुलडोजर वापस दौड़ा रहे हैं। दो करोड़ 18 लाख 27 हजार की धौंतरी-सिरी मोटर मार्ग का निर्माण आधा छोड़कर विभाग ने टिप्पणी लिखी कि 5.75 किमी. के पश्चात मार्ग के समरेखण में विवाद हो गया, जिसके कारण कार्य रोक दिया गया। ब्रह्माखाल-जुणगा मोटर मार्ग दो करोड़ 81 लाख खर्च हुए और उसके बाद पीडब्लूडी ने विवाद दिखाकर कार्य रोक दिया। 82 लाख 66 हजार की लागत से लाखामंडल-भंकोली पुल निर्माण में टिप्पणी लिखी गई कि एबटमेंट में अधिक ऊंचाई की आवश्यकता थी, लेकिन ऊंचाई कम कर दी गई। विभाग आईआईटी रुड़की से दोबारा एबटमेंट तैयार करवा रहा है। हनुमानचट्टी-खरसाली मोटर मार्ग के किमी. नौ से 36 मीटर तक पुल निर्माण कार्य अधर में लटका है। विभाग की टिप्पणी है कि मार्ग निर्माण न होने से पुल का निर्माण शुरू नहीं हो पा रहा है। धौंतरी-सीरी गांव को जोड़ रही सड़क के चार किमी. पर सेतु निर्माण कार्य पर एक करोड़ खर्च हो चुका है और निर्माण पूरा नहीं हो पाया है। विभाग के अनुसार अभी मात्र 35 प्रतिशत निर्माण कार्य ही पूरा हआ है। टिहरी सांसद विजय बहुगुणा से इस बाबत बातचीत करने पर उन्होंने कहा कि निर्माण में विभाग के अफसरों की लापरवाही को लेकर उन्होंने मुख्यमंत्री को पत्र प्रेषित किया है। गंगोत्री क्षेत्र के विधायक गोपाल रावत ने भी सड़कों की प्रगति पर निराशा व्यक्त की। इस संबंध में अधिशासी अभियंता लोनिवि बलदेव सिंह से बातचीत करने पर उन्होंने बताया कि अभी फेज टू के निर्माण कार्य चल रहे हैं और फेज तीन व चार के टेंडर आमंत्रित किए गए हैं। इसके अलावा फेज छह का सर्वे कार्य चल रहा है।

 